HBI Tennesse Office

Case Study

Project Scope

Sq Ft - Pre-Engineered Warehouse Space

Sq Ft - Front Office Space

Sq Ft - Office space within the Warehouse

Why PEMB and the Challenges

    • If reducing initial costs are your top priority, a pre-engineered building can be a good fit. These structures are most cost-effective when you need an open space and have low occupancy requirements. They work well for warehousing, storage, and some athletic facilities.
    • A savvy customer will purchase their pre-engineered steel building in the winter with the intention to build once spring rolls around.
    • Laying a foundation in winter is tricky because the moisture from frozen ground can crack your foundation and ruin your project